12-13-2005, 08:45 AM
No problemo (Terminator voice).
If the guys that are "on the fence" commit, we should have no issues with having them in-hand right after the first of the year. I just need the credit card billing cycle to roll over before I order them. I also want to time it so they get in closer to the opening of Leisure, but with enough time for guys to get them setup and mounted. Remember guys that these things require a power lead from your battery pack, so you'll need a power splitter "Y" harness.
If the guys that are "on the fence" commit, we should have no issues with having them in-hand right after the first of the year. I just need the credit card billing cycle to roll over before I order them. I also want to time it so they get in closer to the opening of Leisure, but with enough time for guys to get them setup and mounted. Remember guys that these things require a power lead from your battery pack, so you'll need a power splitter "Y" harness.